Stages
1. Transfer of the terms of reference to the technical department by the sales manager
Our managers help you choose the most optimal equipment option for individual requests.
2. Design of the chiller by the technical department:
- Development of freon and hydraulic circuits;
- Development of electrical schemes;
- Preparation of a purchase order for components;
- Transfer of the purchase order to the procurement department;
- Preparation of a package of documents for transfer to production;
- Transfer of documents for production.
3. Purchasing of components by the procurement department
High-quality components from European manufacturers are ordered for the chiller.
4. Production:
- Acceptance of documents from the technical department;
- Receiving components from the warehouse;
- Assembly of the case;
- Installation of the main equipment of the case;
- Assembly of the freon circuit;
- Assembly of the hydraulic circuit;
- Insulation of pipelines and heat exchanger-evaporator;
- Pressurization of freon and hydraulic circuits;
- Checking the chiller by the quality control department.
5. Production testing of the chiller:
- Setting the controller parameters;
- Connecting the chiller to the test bench;
- Conducting tests, putting the chiller into operation.
6. Shipment of the chiller:
- Preparing the chiller for shipment;
- Packing the chiller in cardboard and stretch film;
- Shipment of the chiller to the customer.